Raghwat Al Janoub Maintenance and Cleaning
Commercial post-construction cleaning in Al Malqa, Riyadh
Al Malqa mixes upscale villas with flats perched above ground-floor shops, so post-construction jobs here range from spacious residential villas with solid foundations to multi-story flats accessed by lift. Each building type leaves different dust patterns and construction debris that need separate assessment before cleaning starts.
Why this is not routine cleaning
-

Open on your date
The site is handed over clean and clear so furniture goes in and you open without delay.
-

New finishes protected
Marble, glass and cladding are each cleaned the way that surface needs, not with one harsh product.
-

Crews trained on site work
The team knows the difference between cutting silicone off glass and wiping dust, and carries the scrapers and blades for it.
-

Glass without water marks
Hard water in central Saudi Arabia leaves calcium scale on glass, and left long enough it etches the surface so it no longer polishes off.
Why the job is different in Al Malqa
Newly finished homes in Al Malqa hold fine sand and chalky dust accumulated on large glass windows and floors due to proximity to open gardens and parkland The whole method is set out in our notes on commercial post-construction cleaning.
-
Villas on solid foundations and flats above shops
Al Malqa contains freestanding villas with thick concrete slabs and multi-story flats sitting above commercial units, so construction dust settles differently based on the unit's height and the surrounding build. Each type requires its own cleanup approach.
-
Large glass frontages and neighbouring green space
Many villas in Al Malqa open onto Al Malqa Park and surrounding gardens through wide glass walls, so construction dust enters with the air and leaves a thick layer of sand on new glass, sills and fresh flooring.
-
Lifts and shared corridors in multi-story buildings
Flats above shops in Al Malqa need cleaning equipment moved through narrow lifts and shared corridors, so shared flooring and walls must be protected from dust and debris marks during transport and work.
What's Included
Al Malqa sits between King Fahd Road and Imam Saud bin Faisal Road, and proximity to Al Malqa Park spreads fine dust widely after construction, particularly in units facing the gardens and main roads
-
Phased handover
Al Malqa villas and flats above shops each need separate assessment because of differences in building height, foundation size and dust accumulation.
-
Contractor debris removed
Heavy cleaning equipment is moved through narrow lifts and shared corridors in multi-story flats, so we protect shared flooring from marks.
-
Cement haze off every surface
Fine dust from neighbouring Al Malqa Park settles on large glass windows and sills, so we vacuum it as priority before general cleaning.
-
Glass and protective film
White plaster and concrete remains on new floors are removed using specialised equipment before floor washing begins.
-
Mechanical and electrical fixtures
Large glass windows and new glass frontages get special care without scratches or smudges.
-
The final handover clean
Different flooring from marble to tile to engineered wood is checked first to select a safe cleaning method for each type.
Al Malqa on the map
Al Malqa sits about 2.5 km from Al Nakheel West and about 2.5 km from Al Sahafah.
Open in Google MapsHow we work
Survey the site
Clear the debris
Remove dust and film
Wash and hand over
Some of our work
Photos from our team's work.
Landmarks of Al Malqa
Scheduling around Al Malqa Park, Al Malqa Walkway and Al-Makan Mall means visits are arranged so villas near the park and flats close to the mall and shops are reached without one appointment running into the next.
- Al Malqa Park
- Al Malqa Walkway
- Al-Makan Mall
- King Fahd Road
- Riyadh Hills Park
Other services in Al Malqa
The room and the building around it are on one list.