On site

Raghwat Al Janoub Maintenance and Cleaning

Commercial post-construction cleaning across Saudi Arabia

When the contractor leaves, a building is coated in cement dust, silicone and protective film that ordinary cleaning cannot lift.

Why this is not routine cleaning

Cement dust is fine and clings to tile, glass and fittings; wash it straight away and it turns into a mortar-like film that is hard to lift. Protective film on windows and doors bakes in the sun and leaves a sticky residue if left. Washing before this residue is removed ruins new finishes and scratches polished surfaces.

  • Open on your date

    The site is handed over clean and clear so furniture goes in and you open without delay. We agree a handover date up front and hold to it, so cleaning never stalls your opening.

  • New finishes protected

    Marble, glass and cladding are each cleaned the way that surface needs, not with one harsh product. An alkaline cleaner strips cladding coating and the panel then oxidises unevenly, so we use a pH-neutral detergent instead.

  • Crews trained on site work

    The team knows the difference between cutting silicone off glass and wiping dust, and carries the scrapers and blades for it. You can walk the site room by room and check each surface before we move on.

  • Glass without water marks

    Hard water in central Saudi Arabia leaves calcium scale on glass, and left long enough it etches the surface so it no longer polishes off. We clear it at handover before it sets and becomes permanent.

What's Included

We cover the full handover, from clearing the contractor's debris to the final wipe before you take the keys.

  • Phased handover

    We coordinate with your contractor to clean finished floors or wings first while work continues elsewhere, so you take the building in stages rather than waiting for everything to finish at once.

  • Contractor debris removed

    We gather the builders' leftovers, cartons, offcuts, cement bags and wiring, and take them off site completely, so the space is empty and ready for detailed cleaning.

  • Cement haze off every surface

    We lift the clinging cement dust off tile, marble and fittings with the right tools before any washing, so it never turns into a hard, mortar-like layer that resists removal.

  • Glass and protective film

    We peel the protective film off glass and doors before it bakes hard in the sun, then remove silicone and adhesive residue and polish the glass until it reads clear.

  • Mechanical and electrical fixtures

    We clean the mechanical and electrical fixtures, AC outlets, light fittings, sockets and washroom fixtures, and clear the building dust that lodges in vents and filters.

  • The final handover clean

    We make a final top-to-bottom pass over the whole site, wiping down any settled airborne dust and checking every surface is ready for handover and acceptance.

Some of our work

Photos from our team's work.

  • A tower elevation with clean reflective panels beside panels carrying dark streaks
  • Two technicians on ropes washing a faceted metal facade at night with a pressure lance
  • A crew on ropes midway down a blue glass tower topped by two masts
  • Three technicians on ropes above a curved glass roof over a building atrium
  • Five technicians on ropes cleaning the yellow and grey elevation of a medical building
  • Seven technicians in yellow helmets descending parallel ropes on aluminium cladding

Districts we cover

We serve commercial sites across the Kingdom, and you will find the locations we cover listed below. Choose the one nearest you for the details of the service in your area.

The district pages for this service are being prepared and will appear here when they are published.

Questions before booking

When should we book before opening?

Book as soon as the contractor is close to finishing, so we can fit the handover to your opening schedule. Many sites are handed over in phases, so we start on the finished floors while the contractor completes the rest, which saves time overall.

Do we prepare the site before you arrive?

No special preparation is needed from you. We arrive with the tools for dust and film removal and for washing, and we clear the contractor's debris ourselves. It only helps if the construction work in the area we start on is actually finished, so nothing we clean gets dirty again.

Will the cleaning damage new finishes?

No, because we choose a method for each surface separately. Cladding is washed with a pH-neutral detergent, since an alkaline one strips its coating; marble is polished mechanically, not with a coating painted over it. Glass is cleaned before calcium scale sets and etches it.

How long does the site take?

It depends on the floor area, the type of finishes and how much debris is left behind. We give you a rough duration after the survey, and if the handover is phased we set a date for each phase separately, so you can plan when furniture goes in.

Does this suit small shops and offices?

Yes, it suits any commercial unit coming out of fit-out, from a small shop to a whole floor or building. Only the duration and crew size change; the method itself, from clearing debris to the final handover wipe, stays the same.

Will we need cleaning after we open?

Usually yes, because Riyadh dust is fine and constant and settles into fabric weave and AC filters faster than you would expect. The post-construction clean readies the site once, but the AC units and surfaces benefit from a scheduled clean once the space is in use.

Ready to hand your site over clean

Get in touch as your contractor nears the finish, and we will book your handover date and agree the phases. The earlier we coordinate, the readier your site is on opening day.

Call WhatsApp