On site

Raghwat Al Janoub Maintenance and Cleaning

Commercial post-construction cleaning in Al Sulay, Riyadh

Al Sulay is a mixed industrial district in south Riyadh combining warehouses, workshops, vehicle showrooms and residential buildings and flats, all around Shibh Al Jazirah Street and the Second Ring Road. Post-construction cleaning here requires separating ongoing industrial dust from workshops and showrooms from construction residue of the building itself, since the industrial setting means operations never stop during the build.

Why this is not routine cleaning

  • Open on your date

    The site is handed over clean and clear so furniture goes in and you open without delay.

  • New finishes protected

    Marble, glass and cladding are each cleaned the way that surface needs, not with one harsh product.

  • Crews trained on site work

    The team knows the difference between cutting silicone off glass and wiping dust, and carries the scrapers and blades for it.

  • Glass without water marks

    Hard water in central Saudi Arabia leaves calcium scale on glass, and left long enough it etches the surface so it no longer polishes off.

Why the job is different in Al Sulay

In post-construction projects across Al Sulay, industrial dust from neighbouring workshops and showrooms keeps entering the new building even after construction ends because industrial operations never stop. The whole method is set out in our commercial post-construction cleaning guide.

  • Heavy workshops, vehicle showrooms and residential villas close together

    Al Sulay mixes heavy workshops and specialist showrooms directly beside residential buildings and villas, so any new build in an industrial setting needs extra measures to shield it from ongoing industrial dust.

  • Second Ring Road and high daily traffic

    The Second Ring Road runs through Al Sulay carrying heavy daily traffic from trucks and commercial vehicles, so buildings near the road face continuous airborne dust from the movement.

  • New spaces like Al Saidan next to older workshops

    Al Saidan and newer developments sit beside old equipment and traditional workshops still operating daily, so new construction needs protection from old dust and the ongoing environmental impact of neighbouring shops.

What's Included

Al Sulay sits on Shibh Al Jazirah Street and the Second Ring Road next to Mohammed bin Mandour Mosque and new master plans like Al Saidan, so the daily movement of workshops and showrooms means industrial dust is permanently present in the air.

  • Phased handover

    Inspecting the new building means assessing surrounding industrial dust sources and their direct impact on indoor and outdoor spaces.

  • Contractor debris removed

    Industrial dust needs strong targeted vacuuming and repeated cleaning because it keeps drifting in even after construction ends.

  • Cement haze off every surface

    Windows, doors and openings facing workshops, showrooms and the ring road get extra attention and may be cleaned multiple times.

  • Glass and protective film

    Ventilation openings and new AC units are cleared of industrial dust before running to ensure good efficiency from the start.

  • Mechanical and electrical fixtures

    Interior spaces, floors and horizontal surfaces are cleaned to remove heavy industrial particles that settle fast.

  • The final handover clean

    Follow-up one week or more later helps remove dust that naturally drifts in from neighbouring workshops, warehouses and the ring road.

Landmarks of Al Sulay

Work crews in Al Sulay schedule projects based on distance from Shibh Al Jazirah Street, the Second Ring Road, Mohammed bin Mandour Mosque and the new Al Saidan plan, focusing on wind direction and main industrial dust sources that affect cleaning schedules and the follow-up needed.

  • Shibh Al Jazirah Street
  • Mohammed bin Mandour Mosque
  • Second Ring Road
  • Istanbul Street

How we work

Survey the site

Clear the debris

Remove dust and film

Wash and hand over

Some of our work

Photos from our team's work.

  • A tower elevation with clean reflective panels beside panels carrying dark streaks
  • Two technicians on ropes washing a faceted metal facade at night with a pressure lance
  • A crew on ropes midway down a blue glass tower topped by two masts
  • Three technicians on ropes above a curved glass roof over a building atrium
  • Five technicians on ropes cleaning the yellow and grey elevation of a medical building
  • Seven technicians in yellow helmets descending parallel ropes on aluminium cladding

What is different about South Riyadh

South Riyadh is the older, denser and more industrial side of the capital. Manfuhah, Al Shifa, Al Aziziyah, Al Dar Al Baida and Al Faisaliyah are closely built low rise blocks and small villas with shops, workshops and warehouses between them, the wholesale vegetable market sits in Al Aziziyah, and the industrial city and Al Kharj Road carry lorry traffic all day. Oily grime from workshops, diesel soot and soil from unpaved yards build up on ground floors, entrances and tiled floors faster than anywhere else in the city.

Other services in Al Sulay

The room and the building around it are on one list.

Nearby districts we cover

Questions before booking

The workshops next door operate while we build, does that add more dust?

Yes, workshops do not stop when a new building goes up, so we use temporary barriers and controlled openings to cut industrial dust entry and focus on frequent cleaning of open areas during construction itself.

Showrooms and warehouses are all around the site, do they affect cleaning?

Yes, directly, because dust from equipment and goods movement enters the new building easily, so we pay extra attention to cleaning windows, openings and doors facing the showrooms and warehouses.

The ring road is very close, how often does cleaning need to repeat?

The ring road brings continuous airborne dust, so we recommend a full initial clean then follow-up one or two weeks later to make sure dust that may drift in after construction is removed.

Does your cleaning include protection from ongoing industrial dust?

Yes, we focus on thorough cleaning of spaces and can apply protective layers to windows and surfaces if the project owner requests it, but permanent protection from industrial dust needs long-term architectural measures.

Al Saidan new project is next to us, does that cut down the dust?

New and old projects sit close together, so dust may be less from some directions but other workshops stay active, so we assess the site and identify wind direction and main dust sources before planning.

Do we need special cleaning before opening a showroom or display?

Yes, if the project is a showroom or gallery we focus on window and frontage cleanliness from the first step, then do a follow-up the day before opening to make sure the display is pristine.

How much does commercial post-construction cleaning in Al Sulay cost?

It is set after we have seen the job, because the price follows the size of the place, its condition and the time the work takes. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Al Sulay.

Need commercial post-construction cleaning in Al Sulay? Tell us about the place and we will tell you what it needs

We reach Al Sulay at a time we agree, and you get the full cost before we start.

Call WhatsApp