On site

Raghwat Al Janoub Maintenance and Cleaning

Post-construction cleaning across Saudi Arabia

This service is for owners of newly finished homes, offices and shops, once the contractor has left.

Why this is not routine cleaning

When a contractor finishes, the site is left with clinging cement dust, paint spots and silicone lines on glass and aluminium, and none of it comes off with a damp cloth. Wash the floor before those layers are removed and the fine dust settles again onto what you just cleaned, while silicone traces keep collecting grit. Here the residue is stripped first, then the washing and polishing follow.

  • Build residue needs more than wiping

    Cement haze and silicone lines need a scraper and the right chemical for each surface, not a cloth. We use tools that lift the layer without scratching tile, glass or aluminium, and that difference is one you can feel with your hand.

  • The right order, top to bottom

    We start at the ceiling and high vents and work down to the floor, dry before wet. Cleaned this way, dust from one room never falls onto another we have already finished, so the result is even in every corner.

  • Glass and marble handled with care

    Riyadh's mineral dust and the region's hard water leave calcium scale on glass that scratches if you scrub hard or leave it too long. We remove it with the right method and chemical before it bonds and etches the surface.

  • Vents cleared before first use

    Building dust drifts into AC outlets and vents and lodges in the filters, so the first time the unit runs it blows that dust through every room. We clean these outlets before handover, so the AC does not scatter the dust we just removed.

What's Included

We begin by clearing the debris and work across every surface and vent through to the final polish; these are the core steps in each job.

  • Construction debris removed

    We gather the plaster bags, ceramic offcuts, timber scraps and cardboard and take them off site entirely, leaving the space empty and clear to work on and clean.

  • Cement haze removed

    We lift the grey cement film clinging to tiles and ceramic with a scraper and a dedicated chemical, without scratching the surface, so the tile's real colour and shine return.

  • Stickers and protective film stripped

    We strip the stickers and protective film from doors, windows, kitchens and aluminium handles, and clear the leftover adhesive so it does not collect dust later on.

  • Paint spots and silicone smears

    We work off the scattered paint spots and silicone lines on glass, tile and aluminium with a fine scraper, so no spot remains to trap grit or mark the surface.

  • Vents and outlets de-dusted

    We clean the AC outlets and ventilation grilles of the building dust that has settled in them, so the unit does not blow it through the rooms on first use after handover.

  • Final polish of the surfaces

    We wash the floors and polish the glass, marble and metal surfaces at the end, once all residue is gone, so the space is handed over gleaming and ready to use straight away.

Some of our work

Photos from our team's work.

  • A tower elevation with clean reflective panels beside panels carrying dark streaks
  • Two technicians on ropes washing a faceted metal facade at night with a pressure lance
  • A crew on ropes midway down a blue glass tower topped by two masts
  • Three technicians on ropes above a curved glass roof over a building atrium
  • Five technicians on ropes cleaning the yellow and grey elevation of a medical building
  • Seven technicians in yellow helmets descending parallel ropes on aluminium cladding

Related services

The room and the building around it are on one list.

Districts we cover

We offer post-construction cleaning across many cities and districts in the Kingdom, and the areas we cover are listed below, each with its own link. If yours is not there, get in touch and we will check.

Questions before booking

When should I book the clean?

Book it after the contractor has finished all work and before you move furniture in. If furniture arrives first, corners and surfaces are hard to reach and build residue stays trapped beneath it. The space is best cleaned empty, so we can cover it fully and hand it over ready.

Do I need to prepare anything first?

Not much is needed from you. It is enough that the contractor has finished and that water and power are available on site. If you have delicate surfaces such as special marble or fitted appliances, tell us at the survey so we handle them with care.

Are the chemicals safe on new surfaces?

Yes, we match the chemical to each surface. Marble, glass and aluminium each take a different product and strength, and the wrong one scratches or dulls the colour. That is why we survey the surfaces first and test on a small area before treating the whole thing.

How long does the clean take?

It depends on the area, the amount of debris and the state of the surfaces. A small flat may finish in a day, while a full villa can take several. We set the exact time after the survey, not over a call, so we never promise an unrealistic window.

Is this only for villas or also offices and shops?

It is for any newly finished space: villa, flat, office, shop or showroom. The principle is the same in all of them, removing build residue before washing, but the surfaces and quantities differ, and that is what we settle at the survey before we start.

How do I keep it clean afterwards?

After handover, Riyadh's fine dust returns quickly, so wipe surfaces with a dry cloth and wash the glass before calcium scale builds up. Clean the AC filters regularly so they do not spread dust again, and we are ready for any routine clean you want later.

Get your new space move-in ready

Has the contractor just finished? Get in touch to book a survey, and we will agree a time to hand the space back clean and ready for your furniture.

Call WhatsApp