On site

Raghwat Al Janoub Maintenance and Cleaning

Post-construction cleaning in Salah Al Din, Riyadh

Salah Al Din sits north of Riyadh near King Khalid International Airport and Riyadh Air Base, with family villas and apartments in varied designs. The ground behind the built area is still under development, so desert dust and fine sand pour in constantly, settling thick on every new surface.

Why this is not routine cleaning

  • Build residue needs more than wiping

    Cement haze and silicone lines need a scraper and the right chemical for each surface, not a cloth.

  • The right order, top to bottom

    We start at the ceiling and high vents and work down to the floor, dry before wet.

  • Glass and marble handled with care

    Riyadh's mineral dust and the region's hard water leave calcium scale on glass that scratches if you scrub hard or leave it too long.

  • Vents cleared before first use

    Building dust drifts into AC outlets and vents and lodges in the filters, so the first time the unit runs it blows that dust through every room.

Why the job is different in Salah Al Din

Fine sand from the open desert south enters every corner during construction and will not shift on hot or cold water alone. White deposits appear on glass before surfaces even dry. The whole method is set out in our notes on post-construction cleaning.

  • Desert sand penetrates everything before envelope is sealed

    Fine sand from the open ground enters every opening and gap before windows are even fitted. It settles on every surface, floor and step. Clearing this sand from joints and deep corners needs careful hand work before the space is washed, because ground-in sand will not float off water alone.

  • Hard water scale bonds fast in the heat

    Construction supply water is very hard and leaves thick white coating on glass and stone within hours. The hot dry air speeds evaporation and accelerates deposit. This white scale needs a gentle acid bath that does not etch light render stone, and the window must be protected while it sits.

  • Wind blows fresh dust back onto cleaned surfaces

    The surrounding ground is open and construction sites ring the quarter on all sides. Wind carries sand and dust back onto clean surfaces fast. A second cleaning pass may be needed after one or two days if winds persist, because the exposure is constant.

What's Included

A new residential quarter of villas and apartments sited on open desert still being built around it, with hard supply water from main lines and extreme heat that speeds evaporation and leaves salt deposits fast on glass and stone.

  • Construction debris removed

    Fine desert sand enters every opening and seam before the envelope closes, settling deep in joints and corners where water alone cannot reach.

  • Cement haze removed

    Cement dust and sand gather on every surface fast from nearby sites and the constant wind.

  • Stickers and protective film stripped

    Stickers on windows and doors leave adhesive traces, and protective film backing leaves residue on glass surfaces.

  • Paint spots and silicone smears

    Paint spots and silicone marks bite into light stone and need gentle treatment to avoid etching the render itself.

  • Vents and outlets de-dusted

    Exterior and interior vents and openings are blocked with heavy fine sand before any air system can run.

  • Final polish of the surfaces

    Light stone and glass need gentle final polish, and all surfaces dry fast before wind carries dust back in.

Salah Al Din on the map

Salah Al Din sits about 2.5 km from Al Waha and about 3.5 km from King Abdullah.

Open in Google Maps

How we work

Site survey

Clear the debris

Strip residue and dust

Wash, polish and hand over

Some of our work

Photos from our team's work.

  • A tower elevation with clean reflective panels beside panels carrying dark streaks
  • Two technicians on ropes washing a faceted metal facade at night with a pressure lance
  • A crew on ropes midway down a blue glass tower topped by two masts
  • Three technicians on ropes above a curved glass roof over a building atrium
  • Five technicians on ropes cleaning the yellow and grey elevation of a medical building
  • Seven technicians in yellow helmets descending parallel ropes on aluminium cladding

What is different about North Riyadh

North Riyadh is where the capital has grown fastest. Along the Northern Ring Road and King Salman Road, districts such as Al Malqa, Hittin, Al Yasmin, Al Narjis and Al Sahafa are largely new villas in light render, stone and glass, while the King Abdullah Financial District and the towers around Riyadh Front add curtain wall glass and marble lobbies. Beyond Al Arid and Al Qirawan the plots are still being built, so cement dust and fine sand from the open desert towards Banban settle on every surface, and the hard blended supply water leaves scale on glass and stone.

Nearby districts we cover

Questions before booking

Does sand blow back into a new villa right after cleaning?

Yes, the surroundings are open and building continues around. Wind carries fine sand everywhere. A week after cleaning, floors and windows will gather new sand. This is normal in Salah Al Din and needs periodic cleaning in the first months.

Do white deposits on light render stone disappear completely?

Deposits do lift but light stone needs care. Natural stone is sensitive to strong acids. We use gentle solutions and test a small patch first. Traces may remain but visibility is clear and water beads off.

Are apartments and villas cleaned the same way?

Villas and apartments differ slightly. Villas sometimes have soft finishes on floors that sand can scratch. Apartments in blocks have tougher floors. But both need careful sand and deposit removal from the start, handled the same way.

When is it safe to open windows and doors after finishing?

Windows open right after we finish. Expect fresh sand to blow in the first few days because of the wind. Close windows before dusk if wind is strong, and plan for additional cleaning a week in.

Does the air conditioning system need pre-start cleaning?

Yes, filters collect sand and dust during construction. Before any unit runs, we open filters and ducts and clear sand and debris. Without this, the cooler spreads dust through every room.

How long does cleaning a new villa take with the landscaping?

A full villa with the grounds takes longer. Garden floor is sand and cement and new planting collects dust fast. Villa and grounds together are two to three days depending on villa size and deposit depth.

How much does post-construction cleaning in Salah Al Din cost?

It is set after we have seen the job, because the price follows the size of the place, its condition and the time the work takes. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Salah Al Din.

Need post-construction cleaning in Salah Al Din? Tell us about the place and we will tell you what it needs

We reach Salah Al Din at a time we agree, and you get the full cost before we start.

Call WhatsApp