On site

Raghwat Al Janoub Maintenance and Cleaning

Water tank waterproofing in Al Raid, Riyadh

Al Raid is a mixed district in northwest Riyadh near King Saud University and The Zone commercial complex. Tanks here sit above villas and flats along quiet, organised internal streets, but proximity to the university and seasonal student movement can mean repeated building activity and ground vibration affecting foundation stability.

Why a tank needs sealing, not patching

  • Water you store stays stored

    A lined tank keeps the water it holds instead of feeding a slow leak into the slab.

  • The damp stain has a cause

    The wet patch on the ceiling or wall below a tank is the symptom, and the tank is usually the cause.

  • Safe to hold drinking water

    The materials we apply are rated for potable water, so the tank is safe to drink from once it is back in use.

  • Proven before you rely on it

    We do not hand a tank back on trust.

Why the job is different in Al Raid

Tanks in Al Raid may be affected by vibration from traffic on the nearby main road, speeding the appearance of fine cracks that grow over time. The whole method is set out in the details of our water tank waterproofing service.

  • Proximity to a university and commercial complex

    Al Raid lies close to King Saud University and a large commercial complex. Seasonal student movement and visitor traffic can cause vibrations on the main road surrounding the neighbourhood.

  • Quiet streets but a busy main road

    Al Raid's internal streets are very quiet, but Prince Turki bin Abdulaziz Al Awwal Road surrounds them with constant traffic. Vibration transfers to buildings and tanks.

  • Relatively new foundation but under stress

    The neighbourhood is relatively new and the foundation young, but constant vibration from traffic may cause cracks that grow slowly. Sealing protects the tank from this ongoing stress.

What's Included

Al Raid sits close to King Saud University and The Zone mall, with quiet ordered internal streets but regular traffic on Prince Turki bin Abdulaziz Al Awwal Road adding periodic vibration.

  • Emptied and fully dried

    Draining a tank in Al Raid may be straightforward if it is new and has permanent pumps installed, or may need portable equipment depending on the setup.

  • Cracks and leak points surveyed

    Finding cracks in a new tank is hard because they may be invisible, but careful inspection will reveal them.

  • Surface prepared before coating

    Cleaning the inside removes building dust and deposits, allowing the seal to bond completely throughout.

  • Waterproofing applied in coats

    The waterproof material is applied carefully to every weak point, with a second coat providing extra protection against ongoing vibration.

  • Full curing time

    Full curing takes a normal timeframe in Al Raid, and natural or assisted ventilation may be needed.

  • Fill test before handover

    Testing before handover happens by filling gradually and monitoring closely for any new seeping even under future vibration.

The character of Al Raid

Mixed district: shops at street level with homes above them

In Al Raid, a mixed tank may serve luxury villas and modest flats together. Sealing protects the investment in this new, quiet neighbourhood from vibration and future seeping.

How we work

Look at the tank

Drain and prepare

Apply and cure

Fill, test and hand over

Some of our work

Photos from our team's work.

  • A tower elevation with clean reflective panels beside panels carrying dark streaks
  • Two technicians on ropes washing a faceted metal facade at night with a pressure lance
  • A crew on ropes midway down a blue glass tower topped by two masts
  • Three technicians on ropes above a curved glass roof over a building atrium
  • Five technicians on ropes cleaning the yellow and grey elevation of a medical building
  • Seven technicians in yellow helmets descending parallel ropes on aluminium cladding

Landmarks of Al Raid

Tanks in Al Raid sit near King Saud University and The Zone mall, positioned close to Prince Turki bin Abdulaziz Al Awwal Road where we can reach and schedule the work efficiently.

  • King Saud University
  • The Zone Mall
  • Prince Turki bin Abdulaziz Al Awwal Road

Nearby districts we cover

Questions before booking

Do vibrations from Prince Turki Road affect tanks in Al Raid?

Yes. Vibrations from traffic transfer to the foundation and tanks, and may cause fine cracks that grow over time.

Does Al Raid's proximity to the university affect the tanks?

The university itself is distant from residential tanks. But seasonal student movement may increase vibrations on surrounding roads.

Does The Zone commercial complex affect water quality in Al Raid?

The complex is far from residential tanks. But increased traffic may cause vibrations and dust in the neighbourhood.

Are tanks in Al Raid newer than tanks in other areas?

Yes. The neighbourhood is relatively young and tanks are newer. But the fresh foundation may settle slowly and produce cracks.

Should newly built Al Raid homes have tanks sealed immediately?

Do not wait for seeping. Early protective sealing guards a new tank against cracks that may appear as the foundation settles.

After sealing, will I see a noticeable drop in the water bill in Al Raid?

If the tank is losing water, the difference will be obvious. If it is still sound, sealing protects against future seeping.

How much does water tank waterproofing in Al Raid cost?

It is set after we have seen the job, because the price follows the size of the place, its condition and the time the work takes. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Al Raid.

Need water tank waterproofing in Al Raid? Tell us about the place and we will tell you what it needs

We reach Al Raid at a time we agree, and you get the full cost before we start.

Call WhatsApp