On site

Raghwat Al Janoub Maintenance and Cleaning

Water tank waterproofing in Badr, Riyadh

Badr is a new, fast-growing residential district in south Riyadh within Al Shafa municipality, with recently built villas and flats. Infrastructure is still being completed, and vacant plots dot the neighbourhood. Tanks in new homes need protection from damp from the start, and leaks affect the new project quickly. Sealing from inside safeguards the early investment.

Why a tank needs sealing, not patching

  • Water you store stays stored

    A lined tank keeps the water it holds instead of feeding a slow leak into the slab.

  • The damp stain has a cause

    The wet patch on the ceiling or wall below a tank is the symptom, and the tank is usually the cause.

  • Safe to hold drinking water

    The materials we apply are rated for potable water, so the tank is safe to drink from once it is back in use.

  • Proven before you rely on it

    We do not hand a tank back on trust.

Why the job is different in Badr

Badr tanks are new but face repeated pressure from consumption, and cracks appear in new homes because of pressure and unstable ground. The whole method is set out in the water tank waterproofing overview.

  • New building, incomplete infrastructure and tank stress

    Badr is new and growing fast; tanks are new but stressed by consumption and vibration from nearby construction. Unstable ground and ongoing building around the project cause early cracks in new tanks. Sealing from inside protects against these pressures and early cracking.

  • Adjacent industrial zone brings damp and oily grime

    Badr sits next to a small industrial zone, and oily grime and industrial dust may enter the tank. Damp from leaks mixes with this pollution and spoils water. Sealing from inside protects against potential contamination.

  • New investment needs immediate protection

    Homes in Badr are new investments, and damp from leaks damages new buildings quickly. Sealing the tank from the start protects your early investment and stops damp problems before they start.

What's Included

Badr is a new, fast-growing residential district in south Riyadh within Al Shafa municipality, with recently built villas and flats, crossed by Imam Malik Road and next to the Al Shafa industrial zone.

  • Emptied and fully dried

    New Badr tanks need full draining and careful drying before sealing starts.

  • Cracks and leak points surveyed

    Cracks in new tanks may be small, but inspection must be thorough and precise.

  • Surface prepared before coating

    The inside surface needs professional cleaning and special preparation before sealing is applied.

  • Waterproofing applied in coats

    Sealing coats are applied carefully to ensure full protection against pressures from ongoing construction.

  • Full curing time

    Curing takes its full time for complete dryness in new homes.

  • Fill test before handover

    The fill test runs carefully to confirm no leaks appear and the new tank is fully protected.

Badr on the map

Badr sits about 5 km from Al Shifa and about 5.5 km from Al Marwah.

Open in Google Maps

How we work

Look at the tank

Drain and prepare

Apply and cure

Fill, test and hand over

Some of our work

Photos from our team's work.

  • A tower elevation with clean reflective panels beside panels carrying dark streaks
  • Two technicians on ropes washing a faceted metal facade at night with a pressure lance
  • A crew on ropes midway down a blue glass tower topped by two masts
  • Three technicians on ropes above a curved glass roof over a building atrium
  • Five technicians on ropes cleaning the yellow and grey elevation of a medical building
  • Seven technicians in yellow helmets descending parallel ropes on aluminium cladding

The character of Badr

New development: ongoing construction and vacant plots between the homes

A new development means building is ongoing and the ground is unstable. Tanks face pressure from vibration and construction work. Sealing protects new tanks from early cracks and leaks.

Nearby districts we cover

Questions before booking

Do brand new tanks in Badr need sealing?

Yes. Even new tanks face pressure from consumption and vibration from building work. Sealing from the start protects against future cracks and leaks.

Does ongoing construction near Badr crack new tanks?

Yes. Vibration from nearby building and unstable ground cause cracks in new tanks. Sealing protects against these pressures.

Does oily grime from workshops get into tanks?

It can, especially with vibration and pressure. Sealing protects the tank from potential pollution and related damp.

Should I wait before sealing the tank in Badr?

No. Sealing from the start protects the tank and project from damp and leaks. Waiting may allow cracks and leaks to develop.

Is water safe to drink in new homes once the tank is sealed?

Yes. Sealing is safe for drinking water after full drying. Water stays clean and safe, and the tank is protected from leaks and pollution.

Should every tank in Badr be sealed at the same time?

No. Each tank is sealed as needed. New homes that notice leaks or pressure should seal their tanks first.

How much does water tank waterproofing in Badr cost?

It is set after we have seen the job, because the price follows the size of the place, its condition and the time the work takes. Send a photo and a description on WhatsApp and we will give you an estimate before we reach Badr.

Need water tank waterproofing in Badr? Tell us about the place and we will tell you what it needs

We reach Badr at a time we agree, and you get the full cost before we start.

Call WhatsApp